Cyprus: Power Cut Rotation Groups by Region

The EAC has published lists dividing areas into groups per district, which will experience rotational power cuts due to increased demand and high temperatures.
In emergencies, the Cyprus Transmission System Operator may proceed with consumer load shedding to balance production with demand.
The power cuts are carried out in sequence and do not exceed 30 minutes. These groups may be modified depending on the circumstances.
Nicosia:
Larnaca-Famagusta:
Paphos:
Limassol: